Quiz-summary
0 of 10 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
Information
Premium Practice Questions
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 10 questions answered correctly
Your time:
Time has elapsed
Categories
- Not categorized 0%
Unlock Your Full Report
You missed {missed_count} questions. Enter your email to see exactly which ones you got wrong and read the detailed explanations.
Submit to instantly unlock detailed explanations for every question.
Success! Your results are now unlocked. You can see the correct answers and detailed explanations below.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Answered
- Review
-
Question 1 of 10
1. Question
The monitoring system at an audit firm has flagged an anomaly related to Transfer switches during third-party risk. Investigation reveals that a contractor installed a manual transfer switch for the emergency lighting system in a high-occupancy assembly building. The audit team must determine if this installation meets the safety standards defined in the National Electrical Code (NEC) for emergency systems. Based on NEC Article 700, what is the primary regulatory concern regarding this specific installation?
Correct
Correct: According to NEC Article 700.5(A), transfer equipment for emergency systems must be automatic. Manual transfer switches are not permitted for emergency systems because these systems are essential for life safety and must function without human intervention during a power failure. Additionally, the equipment must be specifically identified for emergency use.
Incorrect: The requirement for visual signals is a secondary feature and does not permit the use of a manual switch in an emergency system. While fault current ratings are a general requirement for all electrical equipment, they do not override the specific requirement for automatic operation in Article 700. The physical location of the switch in a separate room is a design consideration but does not satisfy the mandatory requirement for automatic transfer functionality.
Takeaway: NEC Article 700 requires that all transfer equipment for emergency systems be automatic to ensure immediate power restoration for life safety loads.
Incorrect
Correct: According to NEC Article 700.5(A), transfer equipment for emergency systems must be automatic. Manual transfer switches are not permitted for emergency systems because these systems are essential for life safety and must function without human intervention during a power failure. Additionally, the equipment must be specifically identified for emergency use.
Incorrect: The requirement for visual signals is a secondary feature and does not permit the use of a manual switch in an emergency system. While fault current ratings are a general requirement for all electrical equipment, they do not override the specific requirement for automatic operation in Article 700. The physical location of the switch in a separate room is a design consideration but does not satisfy the mandatory requirement for automatic transfer functionality.
Takeaway: NEC Article 700 requires that all transfer equipment for emergency systems be automatic to ensure immediate power restoration for life safety loads.
-
Question 2 of 10
2. Question
Your team is drafting a policy on Grounding and bonding for emergency and standby systems as part of gifts and entertainment for a broker-dealer. A key unresolved point is the classification of an emergency power source where the transfer equipment switches the grounded (neutral) conductor. To ensure the safety and reliability of the emergency system during a power failure, the internal audit department must verify that the system is grounded in accordance with the National Electrical Code (NEC). If the neutral conductor is switched, how must the generator be grounded and bonded?
Correct
Correct: According to NEC 250.30, when a transfer switch switches the grounded (neutral) conductor, the generator is classified as a separately derived system. This requires the installation of a system bonding jumper and a connection to a grounding electrode to establish a local ground reference for the derived system, ensuring that fault current has a reliable path back to the source.
Incorrect: Treating the generator as a non-separately derived system is incorrect because the switching of the neutral breaks the solid connection to the service ground. Connecting the grounding electrode conductor only at the service entrance is appropriate for systems where the neutral is not switched. Requiring a bonding jumper at the transfer switch based on a 50-foot proximity rule is not a standard NEC requirement for establishing a separately derived system’s ground.
Takeaway: A generator is classified as a separately derived system if the neutral conductor is switched by the transfer equipment, necessitating independent grounding and bonding at the source.
Incorrect
Correct: According to NEC 250.30, when a transfer switch switches the grounded (neutral) conductor, the generator is classified as a separately derived system. This requires the installation of a system bonding jumper and a connection to a grounding electrode to establish a local ground reference for the derived system, ensuring that fault current has a reliable path back to the source.
Incorrect: Treating the generator as a non-separately derived system is incorrect because the switching of the neutral breaks the solid connection to the service ground. Connecting the grounding electrode conductor only at the service entrance is appropriate for systems where the neutral is not switched. Requiring a bonding jumper at the transfer switch based on a 50-foot proximity rule is not a standard NEC requirement for establishing a separately derived system’s ground.
Takeaway: A generator is classified as a separately derived system if the neutral conductor is switched by the transfer equipment, necessitating independent grounding and bonding at the source.
-
Question 3 of 10
3. Question
Following a thematic review of Emergency Systems and Standby Systems as part of market conduct, a broker-dealer received feedback indicating that the electrical infrastructure at their regional headquarters failed to maintain the integrity of the emergency power supply. An internal audit of the facility’s wiring revealed that the conductors for the emergency lighting system were installed in the same cable tray as the conductors for the legally required standby system. When evaluating this finding against the National Electrical Code (NEC), what is the primary regulatory concern regarding this configuration?
Correct
Correct: According to NEC Article 700.10(B), wiring from an emergency source or emergency source distribution overcurrent protection device to emergency loads must be kept entirely independent of all other wiring and equipment. This strict separation is intended to ensure that a fault in a non-emergency circuit (including legally required standby systems) does not compromise the functionality of the emergency system, which is critical for life safety.
Incorrect: The suggestion that both systems should share a transfer switch is incorrect as emergency and standby systems often require separate transfer equipment to prioritize life-safety loads. Concrete encasement or fire-rated assemblies are requirements for protecting emergency feeders from fire, but they do not waive the requirement to keep emergency wiring independent from other systems. While barriers are used to separate different types of circuits in some equipment, the general rule for emergency systems is total independence from other wiring systems in raceways, trays, and boxes.
Takeaway: NEC Article 700 requires that emergency system wiring be kept physically independent from all other wiring to prevent non-emergency faults from disabling life-safety systems.
Incorrect
Correct: According to NEC Article 700.10(B), wiring from an emergency source or emergency source distribution overcurrent protection device to emergency loads must be kept entirely independent of all other wiring and equipment. This strict separation is intended to ensure that a fault in a non-emergency circuit (including legally required standby systems) does not compromise the functionality of the emergency system, which is critical for life safety.
Incorrect: The suggestion that both systems should share a transfer switch is incorrect as emergency and standby systems often require separate transfer equipment to prioritize life-safety loads. Concrete encasement or fire-rated assemblies are requirements for protecting emergency feeders from fire, but they do not waive the requirement to keep emergency wiring independent from other systems. While barriers are used to separate different types of circuits in some equipment, the general rule for emergency systems is total independence from other wiring systems in raceways, trays, and boxes.
Takeaway: NEC Article 700 requires that emergency system wiring be kept physically independent from all other wiring to prevent non-emergency faults from disabling life-safety systems.
-
Question 4 of 10
4. Question
In managing Components of fire alarm systems (control units, detectors, notification appliances), which control most effectively reduces the key risk of system failure during a primary power loss while maintaining compliance with NEC Article 760 requirements?
Correct
Correct: According to NEC Article 760, fire alarm systems must have a reliable power supply. A dedicated branch circuit for the fire alarm control unit (FACU) is required to prevent other equipment from tripping the breaker and disabling the system. Additionally, the secondary power supply (typically batteries or a generator) must be capable of operating the system during a primary power outage to ensure life safety functions are maintained.
Incorrect: Class B wiring does not provide a redundant return path; that is a characteristic of Class A wiring. Replacing detectors every five years is a maintenance strategy but does not address the electrical installation risks associated with power and circuit integrity. Connecting fire alarm notification appliances to the emergency lighting circuit is a violation of the NEC requirement for a dedicated fire alarm branch circuit and could lead to circuit overloading.
Takeaway: Reliability in fire alarm systems is primarily achieved through dedicated branch circuits and properly sized secondary power sources as mandated by NEC Article 760.
Incorrect
Correct: According to NEC Article 760, fire alarm systems must have a reliable power supply. A dedicated branch circuit for the fire alarm control unit (FACU) is required to prevent other equipment from tripping the breaker and disabling the system. Additionally, the secondary power supply (typically batteries or a generator) must be capable of operating the system during a primary power outage to ensure life safety functions are maintained.
Incorrect: Class B wiring does not provide a redundant return path; that is a characteristic of Class A wiring. Replacing detectors every five years is a maintenance strategy but does not address the electrical installation risks associated with power and circuit integrity. Connecting fire alarm notification appliances to the emergency lighting circuit is a violation of the NEC requirement for a dedicated fire alarm branch circuit and could lead to circuit overloading.
Takeaway: Reliability in fire alarm systems is primarily achieved through dedicated branch circuits and properly sized secondary power sources as mandated by NEC Article 760.
-
Question 5 of 10
5. Question
If concerns emerge regarding Emergency systems in hazardous locations, what is the recommended course of action? During a facility-wide audit of a Class I, Division 1 chemical processing plant, an auditor identifies that the emergency lighting circuits and the primary process control circuits are being routed through a single, shared explosion-proof conduit system to minimize the number of required boundary seals. The facility manager argues that the use of heavy-wall threaded rigid metal conduit and high-grade seals provides sufficient protection for both systems.
Correct
Correct: According to NEC 700.10(B), wiring from an emergency source to emergency loads must be kept entirely independent of all other wiring and equipment. This requirement is a fundamental safety principle designed to ensure that a fault in a normal power circuit cannot compromise the integrity of the emergency system. In a hazardous location, while the wiring method itself (such as rigid metal conduit) may be the same for both systems, the physical separation into different raceways is still mandatory to maintain system reliability and life safety standards.
Incorrect: Focusing on conduit fill capacity or the integrity of explosion-proof seals addresses general hazardous location installation standards but fails to address the specific NEC requirement for emergency system independence. Identification and marking of emergency circuits are required by code, but such labeling does not permit the co-mingling of emergency and normal circuits in the same raceway. While seal ratings are critical for safety in Class I locations, they do not mitigate the risk of a single electrical fault disabling both primary and emergency systems simultaneously.
Takeaway: Emergency system wiring must be kept physically independent from all other wiring systems to prevent a single point of failure from disabling life-safety equipment.
Incorrect
Correct: According to NEC 700.10(B), wiring from an emergency source to emergency loads must be kept entirely independent of all other wiring and equipment. This requirement is a fundamental safety principle designed to ensure that a fault in a normal power circuit cannot compromise the integrity of the emergency system. In a hazardous location, while the wiring method itself (such as rigid metal conduit) may be the same for both systems, the physical separation into different raceways is still mandatory to maintain system reliability and life safety standards.
Incorrect: Focusing on conduit fill capacity or the integrity of explosion-proof seals addresses general hazardous location installation standards but fails to address the specific NEC requirement for emergency system independence. Identification and marking of emergency circuits are required by code, but such labeling does not permit the co-mingling of emergency and normal circuits in the same raceway. While seal ratings are critical for safety in Class I locations, they do not mitigate the risk of a single electrical fault disabling both primary and emergency systems simultaneously.
Takeaway: Emergency system wiring must be kept physically independent from all other wiring systems to prevent a single point of failure from disabling life-safety equipment.
-
Question 6 of 10
6. Question
The supervisory authority has issued an inquiry to a broker-dealer concerning Wiring methods for swimming pools, fountains, and spas in the context of record-keeping. The letter states that during a compliance audit of the firm’s real estate assets, documentation for the electrical installation of a commercial-grade spa was flagged for review. Specifically, the inquiry focuses on the branch circuit wiring for the circulation pump. To satisfy the regulatory request, the firm must confirm the wiring method complies with NEC Article 680. Which of the following is a mandatory requirement for the equipment grounding conductor in the branch circuit supplying a permanently installed pool or spa motor?
Correct
Correct: According to NEC 680.21(A)(1), the branch circuit for a pool motor must contain an insulated copper equipment grounding conductor. This conductor must be sized in accordance with Table 250.122 based on the rating of the overcurrent protective device, but it is specifically required to be no smaller than 12 AWG to ensure durability and a reliable ground path in corrosive environments.
Incorrect: A bare copper conductor is prohibited because the NEC requires insulation to protect the grounding path from the corrosive effects of pool chemicals. Aluminum conductors are not permitted for this specific application because copper is required for its superior corrosion resistance in wet pool environments. While 14 AWG is typically allowed for 15-ampere circuits in general wiring, Article 680 mandates a minimum of 12 AWG for pool motor branch circuits regardless of the breaker size.
Takeaway: Branch circuits for pool and spa motors must utilize an insulated copper equipment grounding conductor with a minimum size of 12 AWG.
Incorrect
Correct: According to NEC 680.21(A)(1), the branch circuit for a pool motor must contain an insulated copper equipment grounding conductor. This conductor must be sized in accordance with Table 250.122 based on the rating of the overcurrent protective device, but it is specifically required to be no smaller than 12 AWG to ensure durability and a reliable ground path in corrosive environments.
Incorrect: A bare copper conductor is prohibited because the NEC requires insulation to protect the grounding path from the corrosive effects of pool chemicals. Aluminum conductors are not permitted for this specific application because copper is required for its superior corrosion resistance in wet pool environments. While 14 AWG is typically allowed for 15-ampere circuits in general wiring, Article 680 mandates a minimum of 12 AWG for pool motor branch circuits regardless of the breaker size.
Takeaway: Branch circuits for pool and spa motors must utilize an insulated copper equipment grounding conductor with a minimum size of 12 AWG.
-
Question 7 of 10
7. Question
A regulatory inspection at a broker-dealer focuses on Requirements for legally required standby systems in the context of conflicts of interest. The examiner notes that the facility’s backup power infrastructure, which supports critical communication and smoke evacuation systems, was recently upgraded. During the audit of the maintenance logs, a discrepancy is found regarding the response time of the automated transfer switches. The internal auditor must determine if the current configuration meets the specific timing requirements mandated by the National Electrical Code (NEC) for these types of systems. According to the NEC, what is the maximum allowable time delay for a legally required standby system to be fully operational and supply the load after the failure of the normal source?
Correct
Correct: According to NEC Article 701.12, legally required standby systems must be designed and installed so that, in the event of failure of the normal supply, standby power will be available within a maximum of 60 seconds. These systems are intended to provide power to selected loads (other than those classified as emergency systems) that could create hazards or hamper rescue or fire-fighting operations if interrupted.
Incorrect: The 10-second requirement is specific to Emergency Systems under NEC Article 700, which are essential for life safety. The 90-second and 120-second options are incorrect as they exceed the maximum time permitted by the NEC for legally required standby systems to restore power to the connected load.
Takeaway: Legally required standby systems must provide power to the connected load within a maximum of 60 seconds following the loss of the primary power source.
Incorrect
Correct: According to NEC Article 701.12, legally required standby systems must be designed and installed so that, in the event of failure of the normal supply, standby power will be available within a maximum of 60 seconds. These systems are intended to provide power to selected loads (other than those classified as emergency systems) that could create hazards or hamper rescue or fire-fighting operations if interrupted.
Incorrect: The 10-second requirement is specific to Emergency Systems under NEC Article 700, which are essential for life safety. The 90-second and 120-second options are incorrect as they exceed the maximum time permitted by the NEC for legally required standby systems to restore power to the connected load.
Takeaway: Legally required standby systems must provide power to the connected load within a maximum of 60 seconds following the loss of the primary power source.
-
Question 8 of 10
8. Question
An internal review at a private bank examining Communications Systems as part of client suitability has uncovered that during a facility-wide technology refresh, several communication cables were routed through the same cable trays as Class 1 power-limited circuits. The audit team is evaluating this finding against the National Electrical Code (NEC) to determine if the installation creates a safety or compliance deficiency. According to the NEC, which of the following is the standard requirement for the separation of communication cables from power and Class 1 circuit conductors?
Correct
Correct: According to NEC Section 805.133(A)(2), communication cables must maintain a minimum separation of 50 mm (2 in.) from conductors of any electric light, power, Class 1, non-power-limited fire alarm, or medium-power network-powered broadband communications circuits. This requirement is designed to prevent hazardous contact and minimize electromagnetic interference, unless specific conditions like the use of a permanent barrier or separate raceways are met.
Incorrect: The option suggesting bundling is incorrect because the NEC generally prohibits mixing communication cables with Class 1 or power circuits in the same enclosure or tray without separation, regardless of insulation voltage ratings. The requirement for separate rooms is an extreme measure not mandated by the NEC for standard installations. While shielding and grounding are good practices for signal integrity, the NEC specifically mandates physical separation distances (2 inches) rather than a 12-inch clearance or mandatory foil shielding for these circuit types.
Takeaway: The NEC requires a minimum 2-inch separation between communication cables and power or Class 1 circuits to ensure safety and prevent hazardous voltage transfer.
Incorrect
Correct: According to NEC Section 805.133(A)(2), communication cables must maintain a minimum separation of 50 mm (2 in.) from conductors of any electric light, power, Class 1, non-power-limited fire alarm, or medium-power network-powered broadband communications circuits. This requirement is designed to prevent hazardous contact and minimize electromagnetic interference, unless specific conditions like the use of a permanent barrier or separate raceways are met.
Incorrect: The option suggesting bundling is incorrect because the NEC generally prohibits mixing communication cables with Class 1 or power circuits in the same enclosure or tray without separation, regardless of insulation voltage ratings. The requirement for separate rooms is an extreme measure not mandated by the NEC for standard installations. While shielding and grounding are good practices for signal integrity, the NEC specifically mandates physical separation distances (2 inches) rather than a 12-inch clearance or mandatory foil shielding for these circuit types.
Takeaway: The NEC requires a minimum 2-inch separation between communication cables and power or Class 1 circuits to ensure safety and prevent hazardous voltage transfer.
-
Question 9 of 10
9. Question
The risk committee at an insurer is debating standards for Communications Systems as part of record-keeping. The central issue is that an internal audit of the firm’s headquarters revealed a significant volume of legacy network cabling left in the plenum-rated ceiling spaces following a 2022 infrastructure overhaul. These cables are no longer connected to equipment and are not intended for future service. To align with the National Electrical Code (NEC) requirements for fire safety and risk management, which action must the facility manager take regarding these specific cables?
Correct
Correct: According to NEC Section 800.25, the accessible portion of abandoned communications cables must be removed. The code defines abandoned cables as those that are not terminated to equipment and not identified for future use with a tag. This requirement is a critical fire safety measure intended to reduce the fuel load (combustible material) in plenum and riser spaces, which are often used for environmental air distribution.
Incorrect: Securing cables to the building structure is a general installation requirement for active cables but does not satisfy the requirement to remove abandoned ones. Grounding is necessary for active communication circuits to protect against surges but is irrelevant for abandoned cables that must be removed. Enclosing abandoned cables in tubing is not a recognized alternative to removal under the NEC unless the cables are specifically tagged and maintained for future use.
Takeaway: To comply with NEC safety standards, all accessible abandoned communication cables must be removed unless they are explicitly tagged for future use.
Incorrect
Correct: According to NEC Section 800.25, the accessible portion of abandoned communications cables must be removed. The code defines abandoned cables as those that are not terminated to equipment and not identified for future use with a tag. This requirement is a critical fire safety measure intended to reduce the fuel load (combustible material) in plenum and riser spaces, which are often used for environmental air distribution.
Incorrect: Securing cables to the building structure is a general installation requirement for active cables but does not satisfy the requirement to remove abandoned ones. Grounding is necessary for active communication circuits to protect against surges but is irrelevant for abandoned cables that must be removed. Enclosing abandoned cables in tubing is not a recognized alternative to removal under the NEC unless the cables are specifically tagged and maintained for future use.
Takeaway: To comply with NEC safety standards, all accessible abandoned communication cables must be removed unless they are explicitly tagged for future use.
-
Question 10 of 10
10. Question
A regulatory guidance update affects how an insurer must handle Grounding and bonding for health care facilities in the context of third-party risk. The new requirement implies that an internal auditor must verify the technical compliance of electrical installations performed by external contractors. During a review of a newly constructed intensive care unit, the auditor notes that the branch circuits serving patient care spaces utilize a specific wiring method. To mitigate liability and ensure adherence to the National Electrical Code (NEC), the auditor must confirm that the grounding configuration provides the necessary level of safety for sensitive environments. Which of the following describes the mandatory grounding arrangement for branch circuits serving these patient care spaces?
Correct
Correct: According to NEC 517.13, branch circuits serving patient care spaces must have a redundant grounding system. This requires two separate grounding paths: one through the metallic raceway or cable armor/sheath (which must be listed as an equipment grounding conductor) and a second path consisting of an insulated copper equipment grounding conductor installed within the raceway or cable.
Incorrect: The use of an isolated grounding busbar is an optional addition for noise reduction but does not satisfy the primary redundant grounding requirement. Sizing a single conductor at 125 percent does not provide the physical redundancy required by the code. Equipotential bonding is a specific requirement for certain areas like operating rooms to minimize voltage potentials, but it does not replace the fundamental branch circuit grounding requirements of the NEC.
Takeaway: In patient care spaces, the NEC mandates a redundant grounding system consisting of both a qualifying metallic enclosure or armor and an insulated copper equipment grounding conductor.
Incorrect
Correct: According to NEC 517.13, branch circuits serving patient care spaces must have a redundant grounding system. This requires two separate grounding paths: one through the metallic raceway or cable armor/sheath (which must be listed as an equipment grounding conductor) and a second path consisting of an insulated copper equipment grounding conductor installed within the raceway or cable.
Incorrect: The use of an isolated grounding busbar is an optional addition for noise reduction but does not satisfy the primary redundant grounding requirement. Sizing a single conductor at 125 percent does not provide the physical redundancy required by the code. Equipotential bonding is a specific requirement for certain areas like operating rooms to minimize voltage potentials, but it does not replace the fundamental branch circuit grounding requirements of the NEC.
Takeaway: In patient care spaces, the NEC mandates a redundant grounding system consisting of both a qualifying metallic enclosure or armor and an insulated copper equipment grounding conductor.